The problem:


Bridlington’s hospital gas pressure exceeded the maximum pressure of their governor. As a result, this affected the supply to their industrial gas dryers. 


Bridlington Hospital required a new 2” governor (pressure regulator) on their existing
gas pipework


Commercial gas engineers, Ormond Pipework Services, were brought in to install the new governor and amend the existing pipework.

 
Our solution: 


To make the changes to the gas pipework, we first turned off the gas supply. 


In order to safely remove the gas from the existing pipework, an
indirect purge was done. 


After the installation was complete, Ormond did a tightness test and purged the pipework back to 100% gas. 


After the successful gas test and purge, a Gas Safe certificate was issued to the staff at Bridlington hospital.   


Finally, the gas supply was tuned back on and the industrial dryers were refired. 


Tasks Involved:

by PETER JAMES 21 Mar, 2024
HOT TAPPING CASE STUDY
by PETER JAMES 21 Mar, 2024
HOT TAPPING CASE STUDY
hot tapping case study
by PETER JAMES 05 Mar, 2024
HOT TAPPING CASE STUDY
by PETER JAMES 10 Jan, 2024
LINE STOPPING CASE STUDY
barnsley hospital mains water hot tapping
by PETER JAMES 10 Jan, 2024
HOT TAPPING CASE STUDY
by PETER JAMES 08 Nov, 2023
LINE STOPPING CASE STUDY
by PETER JAMES 13 Oct, 2023
HOT TAPPING CASE STUDY
hot tapping: UKBIC
by PETER JAMES 13 Oct, 2023
HOT TAPPING CASE STUDY
hot tapping gas pipework for marks and spencer
by PETER JAMES 15 Sept, 2023
HOT TAPPING CASE STUDY
hot tapping gas for Wavin Ltd
by PETER JAMES 22 Aug, 2023
HOT TAPPING CASE STUDY
More posts

Get A Quote Now

Describe your project requirements via the form below:

Instant Quotes  |  Free Site Visits  |  Competitive Prices

Call Now: 07917-667-450

Share by: